Since taking out the hallway wall, we built the pocket door and put up drywall to close off the door during the day/night when we aren't working on this project. We've slowed down just a little bit due to normal full-time jobs, but spend the majority of our nights after work until bedtime working on this bathroom. I've missed two weeks of Grey's Anatomy and Private Practice, but luckily Glee hasn't been new since before Xmas! Hulu is my friend, so once we have time - we'll catch up to the shows!
I guess just posting photos will help visually show you what we've been up to. The last 10 days have been a blur and gone by way too quickly! We've put another layer of under layment on the floor to help raise the level of the room a bit. Built the half wall that will support the tub, glass panels and hide the toilet. We found out that our heat vent goes under the bathtub, so we spent a few days trying to figure out what exactly we wanted to do with the vent and where to put it! In the end, it is running under the tub and will vent out in the half wall. Perfect, easy decision... done. What's next? Insulation was put into the exterior wall and a vapor barrier. We set the tub in place and screwed it into the walls. This baby isn't going anywhere! The last 2 nights have been putting up 'green board' which is a mold resistant drywall. We had friends over for some extra hands to help with the ceiling and Brook and I tackled the walls tonight. DONE and DONE!
New hallway wall and entrance into bathroom (pocket door is hiding). |
Inside the bathroom. Green board is up. To the left will be the double vanity and new linen cabinet. |
View to the right of the doorway - bathtub/shower with half wall. Toilet will be behind the half wall. |
View from toilet area. Wider doorway into bathroom. |
Remaining walls without green board will need tile board. We're planning the entire back wall and wall to the doorway to have tile up to the ceiling. |